Backflow testing software: finish the test report at the assembly
Enter the check valve and relief readings on your phone, get the customer’s signature, and send the signed PDF before you pull away. File it with the water utility by email or copy the readings into its portal. Each assembly keeps its test history, and next year’s retest lands on your call list.

From the gauge to the water utility
- Test at the assembly
Pick the assembly (last year’s make, model and serial are filled in). Enter check valve and relief readings in psid.
- Customer signs on your phone
Pass or fail is worked out from the readings. A failed test adds repairs and the retest on the same report.
- PDF sent before you leave
Your logo, certification number and test kit calibration on one page, emailed to the customer.
- Filed with your purveyor
Send the PDF where email is accepted, or copy the readings into the portal (BSI, VEPO, SwiftComply, Tokay). Retest lands on your call list.
Three things you stop doing
The same form, every assembly, every year
Make, model, serial, size and location are carried over from last year’s test. You only enter the new readings.
Retests slip through the cracks
Each assembly gets a 12-month cycle. Forty-five days before it is due, the customer lands on your call list with the contact’s number, ahead of the utility’s own 30-day notice.
Test kit calibration on every report
Your certification number, test kit serial and last calibration date print on every report automatically, so a purveyor never sends one back for a missing field.
Backflow Prevention Assembly Test Report
The template your account starts with. Switch off any line you don’t use and add your own.
- 01Reason for test
- 02Replaced assembly serial #
- 03Water purveyor
- 04Water account / meter #
- 05Meter reading
- 06Utility device / hazard #
- 07Type of service
- 08Make & model
- 09Assembly type
- 10Serial number
- 11Size
- 12Location of assembly
- 13Bypass meter reading / serial
- 14Line pressure
Show all 42 lines
- 15Line pressure stable
- 16Shut-off valve #1
- 17Shut-off valve #2
- 18Check valve #1
- 19Relief valve opened at
- 20Check valve #2
- 21Air inlet opened at
- 22Check valve held at
- 23Check valve #1
- 24Check valve #2
- 25Relief valve did not open
- 26Air inlet opened fully
- 27Initial test result
- 28Repairs and parts
- 29Repair details
- 30Check valve #1
- 31Relief valve opened at
- 32Check valve #2
- 33Air inlet opened at
- 34Check valve held at
- 35Retest result
- 36Tester certification #
- 37Certification expires
- 38Test kit
- 39Test kit serial
- 40Test kit calibration date
- 41Results filed with the utility on
- 42Notes & recommendations
Backflow assembly models
Backflow test kits
Anything a technician types that is not on the list is added for next time.
Annual test per assembly by default, plus tests after installation, repair or relocation. Reminder 45 days before the due date.
Default: every 12 months · remind 45 days before · change per customer
The call list builds itself
Every customer on a cycle shows up before they are due, with the contact’s name and number. Call, book, mark it booked, and it leaves the list.

What to know for backflow testing
Requirements vary by state, city and the code edition your authority having jurisdiction uses. This is a starting point, not legal advice.
- Most water purveyors require an annual test by a certified tester and a report within 7–30 days. Some accept email or mail; others use a portal (BSI Online, VEPO, SwiftComply, Tokay). Check what your purveyor accepts.
- The report includes the fields found on typical purveyor forms: assembly type, make, model, serial, size, location, initial test readings, repairs, retest and tester certification.
- Where your purveyor requires its own form or portal, you still send the customer a signed copy and keep the history in one place.
Backflow test reports by city and state
Who the report goes to, the deadline and how it is filed differ by utility. Each guide names the rule and links the source.
Backflow testers ask
Does this replace filing in BSI Online or VEPO?
Not yet. Where your purveyor requires a portal, you still file there. The app gives you the readings in one place to copy over, sends the customer their signed copy, and remembers the next test date.
Can I test several assemblies at one address?
Yes. Each assembly is its own unit with its own serial, test history and 12-month cycle, so a property with an irrigation PVB and a fire-line RP shows both.
Which assembly types are supported?
RP, DC, PVB and SVB, with the readings that apply to each type. The model list already includes common Watts, Febco, Wilkins, Zurn and Ames assemblies, and anything you type is added for next time.
What does it cost?
Free for 5 reports a month. Pro is $29 a month for unlimited reports and automatic reminder emails; Team is $69 a month for 3 field technicians. Every account gets 7 days of Pro starting with the first report, no card needed.
Send your next backflow testing report from the job
Free for 5 reports a month. No card. Your logo on every PDF from the first one.
