Backflow test readings check
Enter your gauge readings and get a verdict for each component. On an RP, the relief valve must open at 2.0 psid or more and check valve #1 must hold at least 5.0 psid under the USC Manual; CSA-based forms instead print a buffer C = A − B of at least 3.0 psid. DC checks hold 1.0 psid or more each, and a PVB or SVB air inlet and check valve are held to 1.0 psid. Your test procedure manual and water utility decide pass or fail.
Readings meet the criteria
| Check valve #1 6.4 psid meets the 5.0 psid minimum. | 6.4 | Pass |
| Relief valve opening point (B) 3.2 psid meets the 2.0 psid minimum. | 3.2 | Pass |
| Check valve #2 Closed tight. | — | Pass |
Next step: put these readings on a signed, branded report and copy them field by field into your utility's portal. See the backflow report on a phone →
Numbers only, against the criteria named in the table. Your test procedure manual and your water utility decide pass or fail; closed-tight results, shut-off valves and the test procedure itself stay on your report.How to read the verdict
Each row is one component with its own pass or fail, so a failed assembly tells you where to start the repair. “Enter the remaining readings” means at least one required answer is empty; nothing is judged until every component has a reading. After a repair, use “Clear for retest”, enter the final readings and keep the initial failed readings on the report.
A red “check your readings” note is not a fail. It appears when the numbers do not fit together, for example a relief valve that opens higher than the check valve #1 drop. Re-read before you sign.
The criteria used, and where they come from
- RP, USC Manual: relief valve opens at 2.0 psid or greater; check valve #1 holds at least 5.0 psid (USC lists “1st check valve holds < 5.0 psid” as a failure reason); check valve #2 is recorded closed tight or leaked, with no psid value. Source: USC Cross Talk, Spring 2017, quoting the Tenth Edition.
- RP, CSA B64.10 forms: relief opening “2 psi or greater” and buffer C = A − B “3 psi or greater” (Toronto; Capital Regional District, BC). Select this option when your form prints the buffer.
- DC: each check valve holds 1.0 psid or greater (USC Cross Talk, Spring 2017).
- PVB and SVB: the air inlet begins to open at 1.0 psid or more and opens fully; the check valve holds 1.0 psid or more (PNW-AWWA procedure, City of Lincoln).
- Type II (RPDA, DCDA): enter the main line readings. The bypass check is recorded as tight or leaked, as on TCEQ-20700. This tool applies no numeric minimum to it, because we could not confirm one from a primary source.
Common reasons a reading fails
- Check valve low or leaking: debris on the seat, a worn or nicked seat or disc, a weak or broken spring. Clean, replace with manufacturer parts and test again from the start.
- Relief valve opens late or not at all: a fouled or stuck disc, a weak spring or a damaged diaphragm. A relief that discharges can also come from a leaking check valve #2 or fluctuating supply pressure.
- PVB or SVB air inlet slow or stuck: a dirty or damaged disc, or a float that sticks.
- Misreads: swapped high and low hoses, air trapped in the hoses or test cocks, a shut-off valve that is not fully closed, or a gauge past its accuracy check.
What the check doesn’t cover
Test cock and shut-off valve tightness, installation height and clearance, the test procedure itself, and the gauge accuracy record. Those stay on the report. This tool shows how readings compare with published criteria; it does not say any utility or jurisdiction accepts a result, and a utility may print stricter numbers (for example Liberty Utilities prints 5.0 psid for check valve #1). Always follow your procedure manual and the local form.
Common questions
What are the pass criteria for an RP assembly?
Under the USC Manual field test, the relief valve must open at 2.0 psid or greater, check valve #1 must hold at least 5.0 psid, and check valve #2 must close tight. CSA B64.10 based forms add a buffer, C = A − B, of at least 3.0 psid.
Is a buffer below 3 psid a fail?
On forms that print the 3 psid buffer rule (Toronto, Capital Regional District BC), yes. The USC criteria instead set check valve #1 at 5.0 psid or more. Follow your procedure manual and utility.
What if the relief valve opens higher than check valve #1?
In a working RP the relief opens below the check valve #1 drop, so it points to a misread. Check the hose connections and that the check valve #1 reading was a clean static reading, then repeat both steps.
Does Stampario calculate the buffer on the report?
Yes. The Canadian backflow report works out C = A − B for the initial test and the re-test.
More backflow guides
Who the report goes to, the deadline and how it is filed differ by utility. Each guide names the rule and links the source.
Sources
- USC Foundation for Cross-Connection Control: Cross Talk, Spring 2017 (RP relief valve 2.0 psid, DC 1.0 psid per check, RP failure reasons)
- USC Foundation: sample field test form, 2017 (assembly types, Type II bypass)
- City of Toronto: backflow prevention device test report (buffer C = A − B)
- Capital Regional District (BC): backflow preventer test report, 2025
- PNW-AWWA PVB test procedure (air inlet and check at 1.0 psid)
- City of Lincoln, NE: spill-resistant vacuum breaker testing
- TCEQ-20700 Backflow Prevention Assembly Test and Maintenance Report
Codes change by edition and the authority having jurisdiction (your fire marshal, water purveyor or state agency) decides which rules apply. This page is general information, not legal advice.